SAMPLE PROJECT COST
Beside the architect’s fee and total cost of work, there are a range of other costs that clients should be aware of when planning their budget. We have provided below a rough guide to what these costs are; as well as approximate timeline from one of our ongoing project. This is quite a standard single-storey brick veneer house consisting of 3 bedrooms, 2 bathrooms, single garage; locating at the rear of an existing dwelling.
If you have any question, feel free to reach out to us at tran@tfarc.com